Staged Rollout Strategy
A staged rollout lets you release your app to a fraction of users first, then increase the percentage as you gain confidence in the build. If something goes wrong, you halt the rollout before the majority of users are affected. GPC gives you the commands to control every step from your terminal or CI pipeline.
Why staged rollouts
Every production release carries risk. A staged rollout limits your blast radius. Instead of shipping a new version to 100% of users on day one and scrambling when a crash spike appears, you ship to 1% and watch. If crash rates stay flat, you widen. If they spike, you halt. The cost of a staged rollout is time. The cost of skipping one is a one-star review wave you cannot undo.
Rollout stages
Two common patterns:
Conservative (recommended for most apps)
| Stage | Percentage | Wait |
|---|---|---|
| 1 | 1% | 24 hours |
| 2 | 5% | 24 hours |
| 3 | 10% | 48 hours |
| 4 | 25% | 48 hours |
| 5 | 50% | 48 hours |
| 6 | 100% | Done |
Aggressive (hotfixes, low-risk changes)
| Stage | Percentage | Wait |
|---|---|---|
| 1 | 5% | 12 hours |
| 2 | 20% | 24 hours |
| 3 | 50% | 24 hours |
| 4 | 100% | Done |
Automated rollout with gpc train
The gpc train command runs a staged rollout pipeline for you. It advances through each stage, waits for the configured time gate, checks vitals quality gates, and proceeds or halts automatically.
gpc train \
--app com.example.app \
--track production \
--stages 1,5,10,25,50,100 \
--wait 24h \
--on-breach halt2
3
4
5
6
This starts at 1%, waits 24 hours between each stage, checks crash and ANR rates before advancing, and halts the rollout if any quality gate is breached.
You can also use a named stage preset:
gpc train \
--app com.example.app \
--track production \
--preset conservative2
3
4
Monitoring during rollout
Real-time monitoring with gpc watch
gpc watch streams vitals data while your rollout is active. It shows crash rate, ANR rate, and other metrics in real time.
gpc watch \
--app com.example.app \
--track production \
--interval 15m2
3
4
Checking crash rates
Use gpc vitals crashes to pull crash data for the current release:
gpc vitals crashes \
--app com.example.app \
--days 12
3
Auto-halt on threshold breach
Pass --on-breach halt to gpc watch or gpc train to automatically halt the rollout if vitals exceed your thresholds:
gpc watch \
--app com.example.app \
--track production \
--crash-threshold 2.0 \
--anr-threshold 0.5 \
--on-breach halt2
3
4
5
6
When a threshold is breached, GPC exits with code 6. This exit code is designed for CI gating: any downstream step can check the exit code and act accordingly.
Manual rollout control
Sometimes you need to intervene directly. The gpc releases commands give you full control.
Set a specific rollout percentage
gpc releases promote \
--app com.example.app \
--track production \
--rollout 102
3
4
This sets the current release to 10% of users.
Halt a rollout
gpc releases halt \
--app com.example.app \
--track production2
3
Halting freezes the rollout at its current percentage. No new users receive the update. Users who already have it keep it.
Resume a halted rollout
gpc releases resume \
--app com.example.app \
--track production2
3
This resumes the rollout from where it was halted.
Complete a rollout
gpc releases promote \
--app com.example.app \
--track production \
--rollout 1002
3
4
CI/CD integration
A GitHub Actions workflow that uploads a build, starts a staged rollout, and monitors it with auto-halt:
name: Staged Rollout
on:
workflow_dispatch:
jobs:
rollout:
runs-on: ubuntu-latest
steps:
- uses: actions/checkout@v4
- name: Install GPC
run: npm install -g @gpc-cli/cli
- name: Upload AAB
run: |
gpc releases upload \
--app com.example.app \
--track production \
--rollout 1 \
--aab app/build/outputs/bundle/release/app-release.aab
env:
GPC_SERVICE_ACCOUNT_KEY: ${{ secrets.GPC_SERVICE_ACCOUNT_KEY }}
- name: Monitor rollout
run: |
gpc watch \
--app com.example.app \
--track production \
--crash-threshold 2.0 \
--anr-threshold 0.5 \
--on-breach halt \
--duration 24h
env:
GPC_SERVICE_ACCOUNT_KEY: ${{ secrets.GPC_SERVICE_ACCOUNT_KEY }}2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Semantic exit codes
GPC uses semantic exit codes so CI pipelines can branch on failure reason:
| Code | Meaning |
|---|---|
| 0 | Success |
| 1 | General error |
| 2 | Usage error |
| 3 | Auth failure |
| 4 | API error |
| 5 | Network error |
| 6 | Threshold breach |
Exit code 6 is the one that matters for rollout gating. When gpc watch or gpc train exits with code 6, the rollout has been halted because a vitals threshold was exceeded. Your CI workflow can use this to trigger alerts, open an incident, or block promotion to the next stage.
When to halt
Halt a rollout when any of these conditions appear:
- Crash rate above baseline. Compare the new version's crash rate against the previous version. A 2x increase at any rollout percentage warrants a halt.
- ANR rate spike. ANRs are harder to fix post-release than crashes. Any sustained increase in ANR rate above 0.5% should trigger a halt.
- User-reported issues. Monitor Play Store reviews for the new version. A pattern of reports about the same issue (even if vitals look clean) is a signal to halt and investigate.
The conservative approach is to halt early and investigate. Resuming a halted rollout costs nothing. Shipping a broken build to 100% of users costs everything.
Further reading
gpc trainfor automated staged rollout pipelinesgpc watchfor real-time rollout monitoringgpc releasesfor manual rollout controlgpc vitalsfor crash and ANR data- Exit codes reference for CI scripting patterns